Title: Retrofitting outlet tunnel for Blue River Project

Conference ·
OSTI ID:220028
 [1];  [2];  [3]
  1. Stone & Webster Engineering Corp., Denver, CO (United States)
  2. Corps of Engineers, Portland, OR (United States)
  3. Corps of Engineers, Portland, OR (United States); and others

The major development of the Blue River Project is to use the existing tunnel to supply water to a penstock and turbine located in a proposed powerhouse. The flood release through the tunnel is presently discharged by open channel flow. After the modification, the outlet and a new gate structure will be pressurized to allow combined usage of hydropower and flood release. The velocity through the new gate will increase by almost 70 percent. A complex transition was designed to house the bifurcation to penstock and to the new dual gate structure. A comprehensive physical model study was conducted to examine the effectiveness of the transition. Turbulent pressure fluctuation tests and analyses were performed from upstream of the bifurcation through the new gates. A revised transition was designed to minimize any potential pressure fluctuation and cavitation problems.

OSTI ID:
220028
Report Number(s):
CONF-9507190-; TRN: 96:000708-0110
Resource Relation:
Conference: Waterpower 1995: international conference, San Francisco, CA (United States), 25-28 Jul 1995; Other Information: PBD: 1995; Related Information: Is Part Of Waterpower`95. Volume 1-3; Cassidy, J.L. [ed.]; PB: 2869 p.
Country of Publication:
United States
Language:
English