Status of the Negative Ion Based Heating and Diagnostic Neutral Beams for ITER
- ITER Organization, Cadarache, 13108 St.-Paul-lez-Durance (France)
The current baseline of ITER foresees 2 Heating Neutral Beam (HNB's) systems based on negative ion technology, each accelerating to 1 MeV 40 A of D{sup -} and capable of delivering 16.5 MW of D{sup 0} to the ITER plasma, with a 3rd HNB injector foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) accelerating 60 A of H{sup -} to 100 keV will inject {approx_equal}15 A equivalent of H{sup 0} for charge exchange recombination spectroscopy and other diagnostics. Recently the RF driven negative ion source developed by IPP Garching has replaced the filamented ion source as the reference ITER design. The RF source developed at IPP, which is approximately a quarter scale of the source needed for ITER, is expected to have reduced caesium consumption compared to the filamented arc driven ion source. The RF driven source has demonstrated adequate accelerated D{sup -} and H{sup -} current densities as well as long-pulse operation. It is foreseen that the HNB's and the DNB will use the same negative ion source. Experiments with a half ITER-size ion source are on-going at IPP and the operation of a full-scale ion source will be demonstrated, at full power and pulse length, in the dedicated Ion Source Test Bed (ISTF), which will be part of the Neutral Beam Test Facility (NBTF), in Padua, Italy. This facility will carry out the necessary R and D for the HNB's for ITER and demonstrate operation of the full-scale HNB beamline. An overview of the current status of the neutral beam (NB) systems and the chosen configuration will be given and the ongoing integration effort into the ITER plant will be highlighted. It will be demonstrated how installation and maintenance logistics have influenced the design, notably the top access scheme facilitating access for maintenance and installation. The impact of the ITER Design Review and recent design change requests (DCRs) will be briefly discussed, including start-up and commissioning issues. The low current hydrogen phase now envisaged for start-up imposed specific requirements for operating the HNB's at full beam power. It has been decided to address the shinethrough issue by installing wall armour protection, which increases the operational space in all scenarios. Other NB related issues identified by the Design Review process will be discussed and the possible changes to the ITER baseline indicated.
- OSTI ID:
- 21269134
- Journal Information:
- AIP Conference Proceedings, Vol. 1097, Issue 1; Conference: 1. international symposium on negative ions, beams and sources, Aix-en-Provence (France), 9-12 Sep 2008; Other Information: DOI: 10.1063/1.3112548; (c) 2009 American Institute of Physics; Country of input: International Atomic Energy Agency (IAEA); ISSN 0094-243X
- Country of Publication:
- United States
- Language:
- English
Similar Records
Low pressure and high power rf sources for negative hydrogen ions for fusion applications (ITER neutral beam injection) (invited)
Physical and Experimental Background of the Design of the ELISE Test Facility
Related Subjects
CESIUM
CHARGE EXCHANGE
COMMISSIONING
CURRENT DENSITY
DEUTERIUM IONS
HYDROGEN IONS 1 MINUS
ION BEAMS
ION SOURCES
IPP GARCHING
ITER TOKAMAK
KEV RANGE 100-1000
KEV RANGE 10-100
PLASMA
PLASMA BEAM INJECTION
PLASMA HEATING
PULSES
RECOMBINATION
SPECTROSCOPY
START-UP
TEST FACILITIES