Title: The status of ABWR-II development

Conference ·
OSTI ID:21160576
;  [1];  [2];  [3]
  1. Tokyo Electric Power Company, 1-1-3, Uchisaiwai-cho, Chiyoda-ku, Tokyo, 100-8560 (Japan)
  2. Hitachi, Ltd., 6, Kanda-Surugadai 4-chome, Chiyoda-ku, Tokyo 101-8010 (Japan)
  3. Toshiba Corporation, 8, Shinsugita-cho, Isogo-ku, Yokohama, 235-8523 (Japan)

This paper reports on the current development status of the ABWR-II project, a next generation reactor design based on the ABWR. In the early 90's, a program to develop the next generation reactor for the 21. century was launched, at a time when the first ABWR was still under construction. At the initial stage of this project, development of a 'user friendly' plant design was the primary objective. Thus, the main focus was placed on selecting a design with features promoting ease of operation and maintenance. Meanwhile, the circumstances surrounding the Japanese nuclear power industry changed. The delay of FBR development and the deregulation of the power generation market have significantly boosted the role of light water reactors, and accelerated the need to improve LWR economics. For these reasons, economic competitiveness became an overriding objective in the development of the ABWR-II, with no less importance placed on achieving the highest standards of safety. Several new features were adopted to enhance economic performance: 1700 MW electric output, large fuel bundles, simplified MSIV, large capacity SRV. An output of 1700 MWe was selected for compatibility with the Japanese power grid, and with consideration of current reactor pressure vessel manufacturing capability. Large fuel bundles will contribute to a shortened refueling outage period and a reduction of CRDs. For enhanced safety, the reference design implements a modified ECCS with four subdivision RHR, a diversified power source incorporating gas turbine generators (GTG), an advanced RCIC (ARCIC) and passive heat removal systems consisting of a passive containment cooling system (PCCS) and a passive reactor cooling system (PRCS). The modified ECCS configuration also enables on-line maintenance. While current reactors rely on complex accident management (AM) procedures, implemented by operators in the event of a serious accident, the ABWR-II incorporated severe accident countermeasures at the design stage, to eliminate the need of operator induced AM procedures. The ABWR-II represents one of the most promising and reliable options for the future replacement of older units, without incurring excessive R and D costs. (authors)

Research Organization:
American Nuclear Society, 555 North Kensington Avenue, La Grange Park, IL 60526 (United States)
OSTI ID:
21160576
Resource Relation:
Conference: ICAPP'04: 2004 international congress on advances in nuclear power plants, Pittsburgh, PA (United States), 13-17 Jun 2004; Other Information: Country of input: France; 7 refs; Related Information: In: Proceedings of the 2004 international congress on advances in nuclear power plants - ICAPP'04, 2338 pages.
Country of Publication:
United States
Language:
English