skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The application of integrated safety management principles to the Tritium Extraction Facility project

Journal Article · · Transactions of the American Nuclear Society
OSTI ID:20104509

The DOE has developed a program that is accomplishing a heightened safety posture across the complex. The Integrated Safety Management (ISM) System (ISMS) program utilizes five core functions and seven guiding principles as the basis for implementation. The core functions define the work scope, analyze the hazards, develop and implement hazard controls, perform the work, and provide feedback for improvement. The guiding principles include line management responsibility, clear roles and responsibilities, competence per responsibilities, identification of safety standards/requirements, tailored hazard control, balanced priorities, and operations authorization. There exists an unspecified eighth principle, that is, worker involvement. A program requiring the direct involvement of the employees who are actually performing the work has been shown to be quite an effective method of communicating safety requirements, controlling work in a safe manner, and reducing safety violations and injuries. The Tritium Extraction Facility (TEF) projects, a component of the DOE's Commercial Light Water Reactor Tritium Production program, has taken the ISM principles and core functions and applied them to the project's design. The task of the design team is to design a facility and systems that will meet the production requirements of the DOE tritium mission as well as a design that minimizes the workers' exposure to adverse safety situations and hazards/hazardous materials. During the development of the preliminary design for the TEF, design teams consisted of not only designers but also personnel who had operational experience in the existing tritium and personnel who had operational experience in the existing tritium and personnel who had specialized experience from across the DOE complex. This design team reviewed multiple documents associated with the TEF operation in order to identify and document the hazards associated with the tritium process. These documents include hazards analysis, preliminary safety analysis report, fire hazard analysis, and design process hazards review. As a result of these reviews, hazard mitigation and minimization attributes were incorporated into the design requirements of the TEF.

Research Organization:
DOE, Aiken, SC (US)
OSTI ID:
20104509
Journal Information:
Transactions of the American Nuclear Society, Vol. 82; Conference: 2000 Annual Meeting - American Nuclear Society, San Diego, CA (US), 06/04/2000--06/08/2000; Other Information: PBD: 2000; ISSN 0003-018X
Country of Publication:
United States
Language:
English