Precursor systems analyses of automated highway systems. Task D: Lateral-longitudinal control analysis. Volume 4. AHS system concept evaluation document. Resource materials. Final report, October 1993-November 1994
Technical Report
·
OSTI ID:189758
The report provides the evaluation and conclusions drawn from the Lateral-Longitudinal Control Study, one of a number of Precursor Systems Analyses being performed to develop preliminary concepts for the Automated Highway System. The Document evaluates Representative System Concepts (RSCs) described in the AHS System Concept Definition Document against the functional requirements defined in the AHS Maneuver Definition and Functional Requirements Document. Evaluation criteria are also defined and applied to the RSCs. Relative strengths and weaknesses are described, and system issues are highlighted. The report also presents the results of preliminary simulation work performed under the contract.
- Research Organization:
- Martin Marietta Astronautics Group, Littleton, CO (United States)
- OSTI ID:
- 189758
- Report Number(s):
- PB-96-136544/XAB; CNN: Contract DTFH61-93-C00198; TRN: 60363109
- Resource Relation:
- Other Information: DN: See also Volume 3, PB--96-136536; PBD: Nov 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Precursor systems analyses of automated highway systems. Task D: Lateral-longitudinal control analysis. Volume 3. AHD system concept definition document. Resource materials. Final report, October 1993-November 1994
Precursor systems analyses of automated highway systems. Task D: Lateral-longitudinal control analysis. Volume 2. AHS maneuver definition and functional requirements document. Resource materials. Final report, October 1993-November 1994
Precursor systems analyses of automated highway systems. Activity area D. Lateral and longitudinal control analysis. Final report, September 1993-November 1994
Technical Report
·
Wed Nov 01 00:00:00 EST 1995
·
OSTI ID:189758
Precursor systems analyses of automated highway systems. Task D: Lateral-longitudinal control analysis. Volume 2. AHS maneuver definition and functional requirements document. Resource materials. Final report, October 1993-November 1994
Technical Report
·
Wed Nov 01 00:00:00 EST 1995
·
OSTI ID:189758
Precursor systems analyses of automated highway systems. Activity area D. Lateral and longitudinal control analysis. Final report, September 1993-November 1994
Technical Report
·
Mon May 01 00:00:00 EDT 1995
·
OSTI ID:189758