skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: PVUSA procurement, acceptance, and rating practices for photovoltaic power plants

Technical Report ·
DOI:https://doi.org/10.2172/119944· OSTI ID:119944

This report is one in a series of PVUSA reports on PVUSA experiences and lessons learned at the demonstration sites in Davis and Kerman, California, and from participating utility host sites. During the course of approximately 7 years (1988--1994), 10 PV systems have been installed ranging from 20 kW to 500 kW. Six 20-kW emerging module technology arrays, five on universal project-provided structures and one turnkey concentrator, and four turnkey utility-scale systems (200 to 500 kW) were installed. PVUSA took a very proactive approach in the procurement of these systems. In the absence of established procurement documents, the project team developed a comprehensive set of technical and commercial documents. These have been updated with each successive procurement. Working closely with vendors after the award in a two-way exchange provided designs better suited for utility applications. This report discusses the PVUSA procurement process through testing and acceptance, and rating of PV turnkey systems. Special emphasis is placed on the acceptance testing and rating methodology which completes the procurement process by verifying that PV systems meet contract requirements. Lessons learned and recommendations are provided based on PVUSA experience.

Research Organization:
Pacific Gas and Electric Co., San Ramon, CA (United States). Dept. of Research and Development; Bechtel Corp., San Francisco, CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States); Electric Power Research Inst., Palo Alto, CA (United States); California Energy Resources Conservation and Development Commission, Sacramento, CA (United States)
DOE Contract Number:
FC04-92AL82993
OSTI ID:
119944
Report Number(s):
DOE/AL/82993-21; ON: DE96002015; TRN: AHC29527%%87
Resource Relation:
Other Information: PBD: Sep 1995
Country of Publication:
United States
Language:
English

Similar Records

Photovoltaic balance-of-system designs and costs at PVUSA
Technical Report · Mon May 01 00:00:00 EDT 1995 · OSTI ID:119944

PVUSA instrumentation and data analysis techniques for photovoltaic systems
Technical Report · Sun Oct 01 00:00:00 EDT 1995 · OSTI ID:119944

PVUSA construction and safety: Experience, lessons learned and costs
Technical Report · Thu Sep 01 00:00:00 EDT 1994 · OSTI ID:119944