Bentonite mat demonstration. Final report
The Bentonite Mat Demonstration was developed to provide the Environmental Restoration Department with field performance characteristics and engineering data for an alternative closure cover system configuration. The demonstration was initiated in response to regulatory concerns regarding the use of an alternative cover system for future design configurations. These design considerations are in lieu of the US Environmental Protection Agency (EPA) Recommended Design for Closure Cover Systems and specifically a single compacted kaolin clay layer with a hydraulic conductivity of 1 {times} 10{sup {minus}7} cm/sec. This alternative configuration is a composite geosynthetic material hydraulic barrier consisting from bottom to top: 2 ft compacted sandy clay layer (typical local Savannah River Site soil type) that is covered by a bentonite mat--geosynthetic clay liner (GCL) and is overlaid by a 40 mil High Density Polyethylene (HDPE) geomembrane--flexible membrane liner. This effort was undertaken to obtain and document the necessary field performance/engineering data for future designs and meet regulatory technical requirements for an alternative cover system configuration. The composite geosynthetic materials hydraulic barrier is the recommended alternative cover system configuration for containment of hazardous and low level radiological waste layers that have a high potential of subsidence to be used at the Savannah River Site (SRS). This alternative configuration mitigates subsidence effects in providing a flexible, lightweight cover system to maintain the integrity of the closure. The composite geosynthetic materials hydraulic barrier is recommended for the Sanitary Landfill and Low Level Radiological Waste Disposal Facility (LLRWDF) Closures.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC09-89SR18035
- OSTI ID:
- 105732
- Report Number(s):
- WSRC-TR-94-0618; ON: DE95017481
- Resource Relation:
- Other Information: PBD: 30 Dec 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Surface barriers: Problems, solutions, and future needs
Structural analysis of closure cap barriers: A pre-test study for the Bentonite Mat Demonstration Project