skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Fermilab PXIE Beam Diagnostics Development and Testing at the HINS Beam Facility

Conference · · Conf.Proc.C1205201:954-956,2012
OSTI ID:1048429

Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA CW H- beam up to 30 MeV. Some of the major goals of the project are to test a CW RFQ and H- source, a broadband bunch-by-bunch beam chopper and a low-energy superconducting linac. The successful characterization and operation of such an accelerator place stringent requirements on beamline diagnostics. These crucial beam measurements include bunch currents, beam orbit, beam phase, bunch length, transverse profile and emittance and beam halo and tails, as well as the extinction performance of the broadband chopper. This paper presents PXIE beam measurement requirements and instrumentation development plans. Presented are plans to test key instruments at the Fermilab High Intensity Neutrino Source (HINS) beam facility. Since HINS is already an operational accelerator, utilizing HINS for instrumentation testing will allow for quicker development of the required PXIE diagnostics.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1048429
Report Number(s):
FERMILAB-CONF-12-239-AD; TRN: US1204198
Journal Information:
Conf.Proc.C1205201:954-956,2012, Conference: Presented at the 3rd International Particle Accelerator Conference (IPAC-2012), New Orleans, Louisiana, 20-25 May 2012
Country of Publication:
United States
Language:
English

Similar Records

Beam Instrumentation of the PXIE LEBT Beamline
Conference · Mon Jun 01 00:00:00 EDT 2015 · OSTI ID:1048429

Status of the PXIE Low Energy Beam Transport Line
Conference · Tue Jul 01 00:00:00 EDT 2014 · OSTI ID:1048429

CW Room Temperature Re-Buncher for the Project X Front End
Conference · Wed May 09 00:00:00 EDT 2012 · Conf.Proc.C1205201:3880-3882,2012 · OSTI ID:1048429