Title: LLNL's Diagram of Chronological Events and B695 Weekly Inspection Reports

Technical Report ·
DOI:https://doi.org/10.2172/1022153· OSTI ID:1022153

Activities leading to the incident were: (1) RCRA Class 2 Permit Modification granted on July 25, 2007 to install a walk-in fume hood in room 1025; (2) USQ-695-07-148 to do the work approved on 9/17; (3) ducting removed early October done by Facility Personnel under IWS 10331.09; (4) ducting swiped for 'free release' radioactivity only by team 1 personnel on 10/16; (5) all ducting and valves remained in building 695 room 1025 except for one piece delivered to building 391 (MMED shop); (6) material delivered by facility personnel to MMED shope B391 on about 10/19; (7) MMED personnel took a duct piece to B511 shop and removed the flange which went to salvage; (8) MMED personnel took the duct piece back to B391 shop and welded on a cap; (9) RHWM personnel picked up the welded duct from B391 around 10/26 and returned ti to B695 room 1025; and (10) the analysis report receive don 12/3 indicated that beryllium swipes take on 11/16, in B695 room 1025, and on ducting that did not leave the room where personnel worked, were above the release level for beryllium.

Research Organization:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
1022153
Report Number(s):
LLNL-TR-475451; TRN: US201118%%326
Country of Publication:
United States
Language:
English

Similar Records

Documented Safety Analysis for the B695 Segment
Technical Report · Thu Sep 11 00:00:00 EDT 2008 · OSTI ID:1022153

Technical Safety Requirements for the B695 Segment of the Decontamination and Waste Treatment Facility
Technical Report · Fri Sep 07 00:00:00 EDT 2007 · OSTI ID:1022153

Technical Safety Requirements for the B695 Segment
Technical Report · Thu Sep 11 00:00:00 EDT 2008 · OSTI ID:1022153