Advanced reactors transition fiscal year 1995 multi-year program plan WBS 7.3
This document describes in detail the work to be accomplished in FY-1995 and the out years for the Advanced Reactors Transition (WBS 7.3). This document describes specific milestones and funding profiles. Based upon the Fiscal Year 1995 Multi-Year Program Plan, DOE will provide authorization to perform the work outlined in the FY 1995 MYPP. Following direction given by the US Department of Energy (DOE) on December 15, 1993, Advanced Reactors Transition (ART), previously known as Advanced Reactors, will provide the planning and perform the necessary activities for placing the Fast Flux Test Facility (FFTF) in a radiologically and industrially safe shutdown condition. The DOE goal is to accomplish the shutdown in approximately five years. The Advanced Reactors Transition Multi-Year Program Plan, and the supporting documents; i.e., the FFTF Shutdown Program Plan and the FFTF Shutdown Project Resource Loaded Schedule (RLS), are defined for the life of the Program. During the transition period to achieve the Shutdown end-state, the facilities and systems will continue to be maintained in a safe and environmentally sound condition. Additionally, facilities that were associated with the Office of Nuclear Energy (NE) Programs, and are no longer required to support the Liquid Metal Reactor Program will be deactivated and transferred to an alternate sponsor or the Decontamination and Decommissioning (D and D) Program for final disposition, as appropriate.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10189603
- Report Number(s):
- WHC-SD-FF-SSP-052; ON: DE95001565; BR: 35AF11201/35AF11202; TRN: 94:021204
- Resource Relation:
- Other Information: PBD: 22 Sep 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1
Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
FFTF REACTOR
REACTOR SHUTDOWN
FINANCING
PLANNING
SCHEDULES
SAFETY
REACTOR MAINTENANCE
REACTOR FUELING
SPENT FUEL STORAGE
DRAINAGE
AUXILIARY SYSTEMS
220600
210500
RESEARCH
TEST
TRAINING
PRODUCTION
IRRADIATION
MATERIALS TESTING REACTORS
POWER REACTORS
BREEDING