skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Fire hazards estimation for Fire Hazards Analyses for Department of Energy facilities at the Savannah River Site (SRS)

Conference ·
OSTI ID:10171988

During the performance of Fire Hazards Analyses (FHA) for Department of Energy facilities, the Fire Protection Engineer (FPE) is required to estimate fire hazards within a facility or fire area in question. A FHA attempts to describe and establish the relationships between fire and its environment. However, standardized tools and methods to produce quantitative descriptions of hazards have not been readily available or utilized at DOE sites in the past. The method of {open_quotes}hand type{close_quotes} calculations discussed in this paper, were developed to address deficiencies in the {open_quotes}average fuel loading{close_quotes} method of calculating fire severities. This methodology has been developed as a method of continuing to perform FHAs under the {open_quotes}Interim Guidance{close_quotes} from DOE, on the performance of FHAs. The method described, has not received approval from DOE, nor has any been requested. It is changing and improving during use, and is being presented to provide an example of a potential calculation methodology. Using established engineering relationships and the hazards inventories present within a fire area, an engineer can predict the severities, damage potential, and impact on building systems and occupants. Some of these procedures and correlations have existed for a number of years, however, the computer has made it easy for the FPE to use them on a day to day basis. The method described has been used at the Savannah River Site (SRS) to estimate fire severities and consequences in preparing a revision to the FHA for an existing Chemical Separations Facility. The object was to develop scenarios that predict realistic severities and losses, that would be utilized to develop cost efficient upgrades to protect the employees and public from the consequences of a fire in the facility. This FHA has not been submitted to DOE for review and comment as of the date of this paper.

Research Organization:
Westinghouse Savannah River Co., Aiken, SC (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC09-89SR18035
OSTI ID:
10171988
Report Number(s):
WSRC-MS-92-234; CONF-9206385-1; ON: DE93016740; TRN: 93:002306
Resource Relation:
Conference: SFPE symposium on the preparation of fire hazards analysis for DOE facilities,Idaho Falls, ID (United States),23-24 Jun 1992; Other Information: PBD: [1992]
Country of Publication:
United States
Language:
English