skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Commissioning and first operational experience of the 400 MeV Linac at Fermilab

Conference ·
OSTI ID:10169214

Commissioning of the Fermilab High Energy Linac during September and October of 1993 has increased the energy of the H- linac from 200 to 400 MeV. The Linac Upgrade is one portion of the Fermilab Upgrad and is intended to reduce the incoherent space-charge tuneshift at injection into the 8 GeV Booster. To accomplish this increase in energy within the existing enclosure, four 201.25 MHz drift-tube linac tankshave been replaced by seven 805 MHz side-coupled cavity modules to accelerate the beam from 116 MeV to 400 MeV. Each module is driven with a klystron amplifier delivering 10 MW of peak power for 60 {mu}sec with a maximum pulse repetition rate of 15 Hz. Nominal beam current is 35 mA with a pulselength of 40 {mu}sec. Results from commissioning and operational experience during Fermilab Collider Run 1B are presented.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
10169214
Report Number(s):
FNAL/C-94/181; CONF-940618-18; ON: DE94015524; TRN: 94:014710
Resource Relation:
Conference: EPAC 94 - 4. European particle accelerator conference,London (United Kingdom),27 Jun - 1 Jul 1994; Other Information: PBD: Jul 1994
Country of Publication:
United States
Language:
English

Similar Records

The 400 MeV Linac Upgrade at Fermilab
Conference · Tue Dec 01 00:00:00 EST 1992 · OSTI ID:10169214

The 400 MeV Linac Upgrade at Fermilab
Conference · Tue Dec 01 00:00:00 EST 1992 · OSTI ID:10169214

The Fermilab linac upgrade
Technical Report · Fri Feb 01 00:00:00 EST 1991 · OSTI ID:10169214