skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: LIMB Demonstration Project Extension. Quarterly report No. 6, August--October, 1988

Technical Report ·
DOI:https://doi.org/10.2172/10159621· OSTI ID:10159621

The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

Research Organization:
Babcock and Wilcox Co., Barberton, OH (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
FC22-87PC79798
OSTI ID:
10159621
Report Number(s):
DOE/PC/79798-T22; ON: DE92016130
Resource Relation:
Other Information: PBD: 15 Dec 1988
Country of Publication:
United States
Language:
English