Environmental assessment and finding of no significant impact for completion of flood protection works, Bannister Road Federal Complex, Kansas City, Missouri
The Department of Energy (DOE) proposes to provide partial funding to the Corps of Engineers (COE) for the completion of the flood protection works at the Bannister Road Federal Complex in Kansas City, Missouri. The DOE Kansas City Plant is a major tenant of the Complex. COE has prepared an environmental assessment (EA) for the project which includes the construction of levees, floodwalls, and drainage ditches. DOE has adopted the EA prepared by COE (DOE/EA-0509), this report. Based on the analyses in this EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC 4321 et seq. Therefore, the preparation of an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).
- Research Organization:
- USDOE Assistant Secretary for Environment, Safety, and Health, Washington, DC (United States). Office of NEPA Oversight
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- OSTI ID:
- 10114910
- Report Number(s):
- DOE/EA-0509; ON: DE92006464; NC: NONE
- Resource Relation:
- Other Information: PBD: 18 Sep 1991
- Country of Publication:
- United States
- Language:
- English
Similar Records
Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana
Environmental assessment for the construction, operation, and closure of the solid waste landfill at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky