Amended proposal for R&D on a cluster klystron
This Proposal is an updated version of FWP submitted in March 1992. Significant work has been done since the original proposal, and much of this is reported on in this update. In addition there have been several changes made, some in response to suggestions made by the three reviews sent to us in December, 1992. The new information and changes include: Technical information on the proposed design of the magnetron gun, the magnet, acceleration gap, and electrical system (including a comment on efficiency loss due to high-voltage leakage current). Modification of the phase I and II tests to allow operation of the gun and klystron off the axis of the magnet, thus simulating the magnet situation when multiple beams are used. Modification of phases III and IV to test a cluster of three beams: first a three beam gun, and then three beams with a klystron on one of them. We have added a phase V which would be the testing of a full three-beam demonstration klystron. The mod-anode pulser would now be located on the high voltage deck instead of externally. Power for the pulser and other high voltage components would now be provided by an isolation transformer instead of from a lead battery. We believe these changes have improved the proposed program and thank the reviewers for their constructive suggestions. The design is still evolving. Relatively little work has been done on the detailed klystron design, and none on the beam dump.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH00016
- OSTI ID:
- 10108654
- Report Number(s):
- BNL-49420; CAP-103-CK-93R; ON: DE94004348; TRN: 94:000928
- Resource Relation:
- Other Information: PBD: Jan 1993
- Country of Publication:
- United States
- Language:
- English
Similar Records