skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Overview and Status of the 12 GeV Cryogenic System Upgrade At Jlab

Conference · · AIP Conference Proceedings
DOI:https://doi.org/10.1063/1.3422270· OSTI ID:1010422

As part of the planned Jefferson Laboratory's electron accelerator (CEBAF) power upgrade, ten additional superconducting RF cryomodules will be added to its accelerator linacs. Although physically the same size as each of the original 40 linac cryomodules, each new cryomodule will have approximately 4 times the acceleration power. To support the additional cryomodule heat loads generated, the existing 2K, 4600W Central Helium Liquefier (CHL) plant capacity will be doubled to a total of 9200W at 2K plus 24,000W at 35K for shield loads. The specified base line process cycle has been modeled after the laboratory s "Ganni Helium Cycle" process technology. In addition, a fourth physics experimental "Hall D" will be constructed which will have an additional stand alone 200W at 4K helium cryogenic plant. In October of 2008, Jefferson Laboratory (JLab) received approval for project "Critical Decision 3" construction phase status from the US Department of Energy.

Research Organization:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC05-06OR23177
OSTI ID:
1010422
Report Number(s):
JLAB-ACE-09-976; DOE/OR/23177-0874; TRN: US1101607
Journal Information:
AIP Conference Proceedings, Vol. 1218; Conference: Cryogenic Engineering Conference 2009, June 28- July 2, Tucson, AZ
Country of Publication:
United States
Language:
English

Similar Records

OVERVIEW AND STATUS OF THE 12 GeV CRYOGENIC SYSTEM UPGRADE AT JLAB
Journal Article · Fri Apr 09 00:00:00 EDT 2010 · AIP Conference Proceedings · OSTI ID:1010422

Linac cryogenic distribution system maintenance and upgrades at JLab
Journal Article · Wed Jan 29 00:00:00 EST 2014 · AIP Conference Proceedings · OSTI ID:1010422

Linac cryogenic distribution system maintenance and upgrades at Jlab
Conference · Wed Jan 01 00:00:00 EST 2014 · AIP Conf. Proc. · OSTI ID:1010422